I am sure it was part of a contract but what’s stopping plarial from doing a real class Thomas now that Harry Potter has been done
If they did a real class Thomas which I am sure will happen it will prob be owigawa Thomas and some coaches as that has been gone for a while .
However the real class steam engine was something I was hoping would be super cool . But instead it was just this something that was put in the contract . Will plarail make a less detailed howgrats express later .
If they did a real class steam engine properly I would be expect all of the driving wheels touch the tracks .
I do hope plarail makes a D51 with 8 wheels touching the track but this being in real class range has killed the hope of that happening .
What I am trying to say is that the fact this was in the real class range may have consequences.
Maybe they started the station first but plans changed so they scrapped the real class idea . For this however this is very confusing . And also not good for the future. They just threw this in with the real class track will this be a one time thing or will other cracks start to happen in this range I would hate for this to have a fate similar to the advanced line